1.1 Start with a level sand bed at least 50 mm thick. Take into account the bottom thickness of the foudation box:
Maximum deviation in the groundworks: 1 cm.
1.2 Stretch a string for alignment and position the formwork tightly along the string. Allow for a wall thickness of 100 mm. Use the external dimensions of your foundation as a guide.
1.3 Place the cut corner pieces as tight together as possible and secure them with pegs. Two per corner.
1.4 Cut recesses for the piles directly during installation. Keep a maximum of 2 cm clearance around the pile heads. If more than 75% of the base width is cut away, use snap ties.
1.5 For infill pieces, always keep at least one tongue or groove side intact. This keeps the joint strong and ensures everything fits properly.
2.1 Place concrete spacers on the bottom of the box. The guideline is 3 spacers per linear metre.
2.2 Place timber battens across the box, with a maximum centre-to-centre distance of 80 cm. .
2.3 Place the reinforcement on top of the battens.
2.4 Attach the flat base spacers to the side of the reinforcement cage. Six spacers per linear metre.
2.5 Remove the battens and carefully lower the reinforcement into the formwork.
2.6 Before you continue, check that:
3.1 Place the form ties into the pre-milled notches, with the flat side facing upwards.
3.2 At cut ends of infill pieces, add extra form ties. To do this, cut a notch by hand to a maximum depth of 25 mm, no more than 20 cm from the cut end. 3.3 Secure T-junctions with corner ties — 2 ties per T-junction.
3.4 Secure corner pieces with 4 corner ties per corner.
4.1 Install snap ties on both sides of each passage. This keeps the box stable during the pour.
4.2 Do you have a series of penetrations? Then also install snap ties between them.
Note: Is the distance between penetrations greater than 300 mm? Then install an additional snap tie on each side of each penetration.
4.3 Are there any ground cut-outs for piles that are larger than 75% of the base width? Install additional snap ties there as well.
4.4 Can’t fit any snap ties? Then drive stakes on both sides of the pile.
4.5 Reinforce the stakes with a brace made of battens at an angle of at least 45 degrees.
Prevent leakage by sealing all openings properly. Apply expanding PU foam to:
Have you completed all the steps? Then your formwork is stable, the reinforcement is at the correct height, and all joints are sealed. Exactly as required for a strong, durable foundation.
Alongside foundation boxes, you can also order everything you need for your foundation and floor from us:
all made to size and delivered quickly. That way, you only need one supplier.
Questions about the application, or want a quote straight away? Get in touch. We’re happy to advise.
Delivery and shipping costsWe deliver daily throughout the Netherlands and Belgium. We deliver from Monday to Friday.
Shipping costsShipping costs are displayed in the order overview in the shopping cart.
Order with standard delivery timesShipping costs are shown in the order overview.
Express deliveryExpress delivery is subject to a surcharge. Depending on the size of the order, this surcharge is between € 75 and € 400 (excl VAT). After selecting Express delivery, you will immediately see what the costs are for you.
Self collection is not possible.
Free shipping for orders with a length of up to 6 meters from € 1,200 (excl. VAT) and for orders with a length of up to 12 meters from € 4,000 (excl VAT).
Wadden IslandsWe do not deliver directly to the Wadden Islands. However, we can deliver to transport companies on the mainland that will then transport the goods to the islands.
Select desired delivery dateDuring the ordering process, you can select the desired delivery date. We will do our utmost to deliver on this date. The planned delivery date will be confirmed via email.
What time will the delivery arrive?You will be informed when the order will be delivered and unloaded. One day before the delivery date you will receive a time indication if available. We do our best for a time indication, but this is not always possible.
On the day of delivery, the driver will call approximately 30 minutes before delivery. Our products are shipped via external carriers therefore unfortunately we do not have earlier information about the time of delivery.
An order may consist of multiple deliveries and be delivered by different carriers. You will receive a separate shipping confirmation for each partial delivery with the scheduled delivery date.
UnloadFrom the public road, we unload at the desired location. We do not have a truck-mounted forklift. We unload next to the truck.
If you want to unload on your own property and the truck has to enter your property to do so, any damage is at your own risk.