How to install EPS U-foundation boxes: step by step

Step 1 – Place the elements

1.1  Start with a level sand bed at least 50 mm thick. Take into account the bottom thickness of the foudation box:

  • 7 cm at 100 kPa
  • 6 cm at 200 and 300 kPa

Maximum deviation in the groundworks: 1 cm.

1.2  Stretch a string for alignment and position the formwork tightly along the string. Allow for a wall thickness of 100 mm. Use the external dimensions of your foundation as a guide.


1.3  Place the cut corner pieces as tight together as possible and secure them with pegs. Two per corner.

1.4  Cut recesses for the piles directly during installation. Keep a maximum of 2 cm clearance around the pile heads. If more than 75% of the base width is cut away, use snap ties.

1.5  For infill pieces, always keep at least one tongue or groove side intact. This keeps the joint strong and ensures everything fits properly.

Step 2 – Install reinforcement

2.1  Place concrete spacers on the bottom of the box. The guideline is 3 spacers per linear metre.

2.2  Place timber battens across the box, with a maximum centre-to-centre distance of 80 cm. . 

2.3  Place the reinforcement on top of the battens. 

2.4  Attach the flat base spacers to the side of the reinforcement cage. Six spacers per linear metre. 

2.5  Remove the battens and carefully lower the reinforcement into the formwork.

2.6  Before you continue, check that:

  • the plastic spacers are sitting firmly against the box wall.
  • the reinforcement is resting on the concrete spacers.

Step 3 – Fix the formwork

3.1  Place the form ties into the pre-milled notches, with the flat side facing upwards. 

3.2  At cut ends of infill pieces, add extra form ties. To do this, cut a notch by hand to a maximum depth of 25 mm, no more than 20 cm from the cut end. 


3.3  Secure T-junctions with corner ties — 2 ties per T-junction. 

3.4  Secure corner pieces with 4 corner ties per corner. 

 

Step 4 – Reinforcing around cut-outs

4.1  Install snap ties on both sides of each passage. This keeps the box stable during the pour.

4.2  Do you have a series of penetrations? Then also install snap ties between them. 

Note: Is the distance between penetrations greater than 300 mm? Then install an additional snap tie on each side of each penetration.

4.3  Are there any ground cut-outs for piles that are larger than 75% of the base width? Install additional snap ties there as well. 

4.4  Can’t fit any snap ties? Then drive stakes on both sides of the pile.

4.5  Reinforce the stakes with a brace made of battens at an angle of at least 45 degrees.

Step 5 – Seal joints before the pour

Prevent leakage by sealing all openings properly. Apply expanding PU foam to:

  • Cut ends of infill pieces
  • Around PVC pipes in wall openings
  • Unforeseen gaps in the formwork

Ready for the pour

Have you completed all the steps? Then your formwork is stable, the reinforcement is at the correct height, and all joints are sealed. Exactly as required for a strong, durable foundation.

Alongside foundation boxes, you can also order everything you need for your foundation and floor from us:

  • reinforcing mesh,
  • rebar cages,
  • prefabricated bars

all made to size and delivered quickly. That way, you only need one supplier.